s
DEEPWATER WELL CONTROL WORKSHOP TOPICS
| INTENDED FOR
DRILLING PERSONNEL PREPARING TO WORK IN WATER
DEPTHS IN EXCESS OF 2000 FT. DURATION ONE DAY |
CURRICULUM OUTLINE
| CONDUCTING A SLINGSHOT
DRILL JETTING/DRILLING TOP HOLE AND SETTING 30" CONDUCTOR DRILLING PILOT HOLES RISERLESS DRILLING DRILLING BELOW 30" CONDUCTOR SHALLOW GAS HAZARDS CONTINGENCY PLANS FOR DRILLING SHALLOW GAS KICK DETECTION METHODS DRILLING BELOW 20" OR 13.3/8" CASING POINTS LOSS OF RISER AND RISER MARGIN CALCULATIONS TRIPPING PRACTICES REDUCED FORMATION FRAC GRADIENTS IN DEEPWATER SUBSEA BOP EQUIPMENT DRILLING WITH A RISER DIVERTER SYSTEMS BOP STACK ARRANGEMENT RECORDING CHOKE AND KILL LINE FRICTION SHUT-IN PROCEDURE HANG-OFF PROCEDURE WELL KILLING PROCEDURE(S) GAS REACHES CHOKE LINE TRAPPED GAS IN BOP DISPLACING RISER TO KILL MUD HYDRATE FORMATION VERY DEEP WATER >5000' CONSIDERATIONS WELL CONTROL DRILLS AND PERSONNEL DUTIES SUBSEA HYDRAULIC SYSTEM |